UTAH CODE (Last Updated: January 16, 2015) |
Title 53A. State System of Public Education |
Chapter 20. School Construction |
§ 53A-20-101. Construction and alteration of schools and plants -- Advertising for bids -- Payment and performance bonds -- Contracts -- Bidding limitations on local school boards -- Interest of local school board members.
Latest version.
-
(1) As used in this section, the word "sealed" does not preclude acceptance of electronically sealed and submitted bids or proposals in addition to bids or proposals manually sealed and submitted. (3) (a) The board shall meet at the time and place specified in the advertisement and publicly open and read all received proposals. (b) If satisfactory bids are received, the board shall award the contract to the lowest responsible bidder. (c) If none of the proposals are satisfactory, all shall be rejected. (d) The board shall again advertise in the manner provided in this section. (e) If, after advertising a second time no satisfactory bid is received, the board may proceed under its own direction with the required project. (4) (a) The check or bond required under Subsection (2)(d) shall be drawn in favor of the local school board. (b) If the successful bidder fails or refuses to enter into the contract and furnish the additional bonds required under this section, then the bidder's check or bond is forfeited to the district. (5) A local school board shall require payment and performance bonds of the successful bidder as required in Section 63G-6a-1103. (6) (a) A local school board may require in the proposed contract that up to 5% of the contract price be withheld until the project is completed and accepted by the board. (b) If money is withheld, the board shall place it in an interest bearing account, and the interest accrues for the benefit of the contractor and subcontractors. (c) This money shall be paid upon completion of the project and acceptance by the board. (7) (a) A local school board may not bid on projects within the district if the total accumulative estimated cost exceeds $80,000. (b) The board may use its resources if no satisfactory bids are received under this section. (8) If the local school board determines in accordance with Section 63G-6a-1302 to use a construction manager/general contractor as its method of construction contracting management on projects where the total estimated accumulative cost exceeds $80,000, it shall select the construction manager/general contractor in accordance with the requirements of Title 63G, Chapter 6a, Utah Procurement Code. (9) A local school board member may not have a direct or indirect financial interest in the construction project contract.